therealdesign

RAF Wyton Officers Mess

The officers mess at RAF Wyton in Cambridgeshire was refurbished in June 2014 by CMJ The Complete Fitout Company.  Our works included the recladding of the front bar counter and the existing shutter in oak veneer, a new back fitting was installed complete with tiled upstand and optics rails, along with the installation of veneered panelling to suit.  All worktops were formed from durable laminated tops to match the oak veneer.  The ceiling area was skimmed throughout and the area fully redecorated, the transformation was made complete by the adding of new oak timber floor with a stunning contrasting black Welsh slate tiled splash area. 

Pre-Works

CIMG1070-RAF-Wyton-Officers-mess-pre-works.jpgCIMG1072-RAF-Wyton-Officers-mess-pre-works.jpgCIMG1075-RAF-Wyton-Officers-mess-pre-works.jpg

Completed

IMG_1418-RAF-Wyton-Officers-Mess-completed.jpgIMG_1420-RAF-Wyton-Officers-Mess-completed-new-backfitting-with-ducting.jpgIMG_1422-RAF-Wyton-Officers-Mess-completed.jpgIMG_1423-RAF-Wyton-Officers-Mess-completed.jpgRAF-Wyton.jpg

 

 

Design © MonsterWeb Ltd | Lancashire. All rights reserved.